The movers are coming on Monday.
Panic has ensued.
On Tuesday, when I opened the house up for the carpet installers, the morning light coming through the doorway revealed all manner of holidays in the paint over the opening leading to the dining room.
But dealing with that has to compete with getting a fully functional bathroom together before Monday. The holes are patched, and I just bought the primer and paint. Now I have to tape, prime, and paint; finish assembling and connecting the toilet; install the vanity and medicine cabinet; and put up the towel racks, toilet paper holder, shower curtain rod, and shower curtain. Adding a little over-toilet storage would be a nice bonus, but not likely to happen before move-in.
Other than that, I still need to cut a path from the dryer to the vent hole, get the locks rekeyed (a call is in to the locksmith), and put up curtains. I also need to figure out what I'm doing about bookcases (keeping the open-faced white ones or getting myself to Ikea for 3 more with doors to match the 2 in my apartment's dining room).
Oh, yeah. And pack.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment